Document
Recorded the exterior condition and window areas before opening the wall.
Mitigation & Rebuild · Warwick, Rhode Island
IRP performed selective exterior demolition to uncover concealed moisture damage around multiple windows, document the affected sheathing, and prepare the wall assembly for reconstruction.
What the wall revealed
What began as an exterior water-damage investigation required controlled removal of siding, trim, and weather-barrier material around several window openings. Once opened, the assembly showed extensive deterioration in sections of the sheathing and wood at the window perimeters.
The affected sections were exposed so compromised materials could be evaluated and removed. The photographs document the mitigation and demolition stages while the wall cavities were being prepared for repair and rebuild. The exact property address remains private.
Recorded the exterior condition and window areas before opening the wall.
Removed cladding, trim, and barrier material only where needed to trace the damage.
Opened the assembly to reveal sheathing, framing, insulation, and concealed deterioration.
Documented damaged materials and the extent of the affected wall sections.
Took out compromised exterior materials to create a sound path forward.
Left the wall assembly accessible for drying, repair, and reconstruction work.
Mitigation progress
These photographs show the exterior before demolition, concealed deterioration around the windows, exposed sheathing, and the wall cavities opened in preparation for reconstruction.









Mitigation · Repairs · Reconstruction